South Waterfront Greenway – Central District Improvements

This 100-foot wide regional park extends along the riverbank and near-shore area of the Willamette River for a little over a mile between the Marquam Bridge and an existing trail at John’s Landing. This project also is one of the first in the region to attempt large-scale restoration of a blighted riverbank into functioning habitat … Continue reading South Waterfront Greenway – Central District Improvements

Santa Ana River Interceptor (SARI) Relocation – SARI Mainline Project

Designed as a typical microtunnel project with several short, straight drives, the SARI Mainline offered JWF the perfect opportunity to offer an innovative value engineering proposal to eliminate shafts and combine multiple drives on the project. This saved the Orange County Sanitation District over $1 million and offered a 20% reduction in the tunneling schedule. … Continue reading Santa Ana River Interceptor (SARI) Relocation – SARI Mainline Project